With over 500 successful projects under our belt, we simplify the ADU permit process so you can focus on what matters most—bringing your vision to life.
Dealing with complicated paperwork and municipal requirements can be daunting for anyone– except us, of course. Throughout the entire process, we manage the permitting and coordinate fees, providing you with concierge-level support to ensure your ADU project progresses as efficiently as possible.
We pinpoint the exact surveys and documentation needed for your location to ensure that no detail is overlooked.
We handle all interactions with relevant agencies and governing bodies on your behalf.
We create comprehensive plans that can be easily submitted where needed.
We address complex reviews from the local planning department to minimize delays
We prepare all the necessary paperwork for review.
We manage and coordinate fee payments.
We only recommend contractors who have a proven track record of quality, reliability, and excellence in ADU development.
Whether you have questions, concerns, or changes, our team is happy to be on standby if anything comes up.
We’re confident in the builders we recommend. Rest assured knowing that they carry the necessary credentials, insurance, and warranties.
Initial site visit and review of existing utility conditions.
811 Dig Alert submittal for underground gas and electric services if needed.
Recommendation for panel or gas meter placement to meet utility standards.
Preparation and submittal of SDG&E new service application.
Utility design review for conformance and accuracy.
Estimated utility timelines and construction dates coordination.
Trenching and inspection scheduling with the construction team.
Service connection completion and power is energized.
A Pre-fabricated ADU is built off-site in a factory, then delivered and installed in your backyard. Prefab ADUs use streamlined, factory-controlled construction, standardized designs, and reduced on-site labor.
The estimated timeline to build a Pre-Fab ADU is ~3-4 weeks after permitting compared to an estimated timeline of 2-3 months for a traditional single-story ADU
Prefab ADUs cost roughly 25-36% less per sqft than stick builds for material and labor costs
Factory production optimizes materials, reducing excess waste
Our Prefabs are federally certified by HUD so you can bypass state energy requirements for faster approvals.
Most of the work happens off-site, which means less noise, mess, and inconvenience at your property.
Using repeatable processes and skilled teams, we deliver consistent craftsmanship and quality
Our floor plans are fully customizable to fit your style, space requirements, and goals. Explore some of our favorite ADU floor plans or create one from scratch with your design team.
We take a closer look at all the key SDG&E details that may get missed.
This first step will kickstart the beginning of your SDG&E journey. Through this request, we require your project plans in order to review and curate your personalized action plan.
Our experts will reach out within 24 business hours to schedule a time to meet with you and discuss your property’s utilities. In the meantime, we will review your plans and prepare your personalized proposal.
In your scheduled 30 minute meeting, our team will go over your dry utilities proposal and all that it would entail, including the necessary submittals, timelines, and costing to get you all the way to the finish line.
If you decide to go with us, we get started on your project right away. We will be in consistent and effective communication with the utility company, construction company, and most importantly you– throughout the entire process.
Our projects showcase what’s possible. We've helped numerous clients transform properties, creating housing that uplifts neighborhoods. Now, it's your turn.